| Availability: | |
|---|---|
| Quantity: | |
YX35-117-1000

| No. | Main Parameters | Roll Forming Mill Parameters | ||
| 1. | Decoiler | Manual/Hydraulic for Options | Forming Stations | 14 Stations |
| 2. | Cutter Material | Cr12MOV | Base | H450 |
| 3. | Material Thickness | 1.5-2.5 mm | Side Wall Thickness | Q235 t18mm |
| 4. | Hydraulic Motor | 5.5 KW | Shafts Diameter | φ70mm |
| 5. | Application Material | Gi/CRC | Main Motor Power | 11 KW |
| 6. | Yield Strength | 245-550MPa | Screw Bolts | Grade 8.8 |
| 7. | Forming Speed | 16 m/min | Tie Rod | ф22 Galvanized |
| 8. | Effective Size | As Customer Design | Roller | GCr15(=EN31 steel), precision machined, hard Chrome Coated |
| 9. | Control System | PLC Control System | Processing Mode | CNC lathes, Hear Treatment, hard Chrome Coated, with thickness 0.04mm |
| 10. | Testing Material | BMS Will Provide The Size of Feeding Material to Purchase That 2 Weeks Before Machine Testing | ||
Work Flow
Decoiler→ Feeding Guide Device → Roll Forming Mill→ Hydraulic Post-cutting Device→ PLC System→ Hydraulic Station→ Exit Rack

Machine Components Display

Decoiler Roll Forming Mill

Hydraulic Station Hydraulic Post-cutter Device
Machine Produced Products



![]()


| No. | Main Parameters | Roll Forming Mill Parameters | ||
| 1. | Decoiler | Manual/Hydraulic for Options | Forming Stations | 14 Stations |
| 2. | Cutter Material | Cr12MOV | Base | H450 |
| 3. | Material Thickness | 1.5-2.5 mm | Side Wall Thickness | Q235 t18mm |
| 4. | Hydraulic Motor | 5.5 KW | Shafts Diameter | φ70mm |
| 5. | Application Material | Gi/CRC | Main Motor Power | 11 KW |
| 6. | Yield Strength | 245-550MPa | Screw Bolts | Grade 8.8 |
| 7. | Forming Speed | 16 m/min | Tie Rod | ф22 Galvanized |
| 8. | Effective Size | As Customer Design | Roller | GCr15(=EN31 steel), precision machined, hard Chrome Coated |
| 9. | Control System | PLC Control System | Processing Mode | CNC lathes, Hear Treatment, hard Chrome Coated, with thickness 0.04mm |
| 10. | Testing Material | BMS Will Provide The Size of Feeding Material to Purchase That 2 Weeks Before Machine Testing | ||
Work Flow
Decoiler→ Feeding Guide Device → Roll Forming Mill→ Hydraulic Post-cutting Device→ PLC System→ Hydraulic Station→ Exit Rack

Machine Components Display

Decoiler Roll Forming Mill

Hydraulic Station Hydraulic Post-cutter Device
Machine Produced Products



![]()