| Availability: | |
|---|---|
| Quantity: | |
YX25-211-844

| No. | Main Parameters | Roll Forming Mill Parameters | ||
| 1. | Decoiler | Manual/Hydraulic for options | Forming Stations | 14-step |
| 2. | Cut-to-Length Tolerance | ≤±1 mm | Base | H400 |
| 3. | Material Thickness | 0.3-0.6mm | Side Wall Thickness | Q235 t18mm |
| 4. | Form Speed | 20m/min | Shaft Diameter | ф65mm |
| 5. | Application Material | Prepainted galvanized steel(PPGI) | Main Motor Power | 5.5 KW |
| 6. | Yield Strength | Q235-Q350Mpa | Screw Bolts | Grade 8.8 |
| 7. | Hydraulic Motor | 4 KW | Cutting Tool Material | Cr12MoV, heat treatment to HRC58-62 degree |
| 8. | Effective Size | As Customer Design | Roller | 45# steel |
| 9. | Control System | PLC Control System | Processing Mode | CNC lathes, Hear Treatment, hard Chrome Coated, with thickness 0.04mm |
| 10. | Testing Material | BMS Will Provide The Size of Feeding Material to Purchase That 2 Weeks Before Machine Testing | ||
Work Flow
Decoiler→Manual Pre-Cutter→Guide Feeding →Roll Forming System→Hydraulic Post Cutter →Exit Rack

Machine Components Display

Pre-cutter Roll Forming Mill

Hydraulic Post Cutter PLC Control System
Machine Produced Products



![]()


| No. | Main Parameters | Roll Forming Mill Parameters | ||
| 1. | Decoiler | Manual/Hydraulic for options | Forming Stations | 14-step |
| 2. | Cut-to-Length Tolerance | ≤±1 mm | Base | H400 |
| 3. | Material Thickness | 0.3-0.6mm | Side Wall Thickness | Q235 t18mm |
| 4. | Form Speed | 20m/min | Shaft Diameter | ф65mm |
| 5. | Application Material | Prepainted galvanized steel(PPGI) | Main Motor Power | 5.5 KW |
| 6. | Yield Strength | Q235-Q350Mpa | Screw Bolts | Grade 8.8 |
| 7. | Hydraulic Motor | 4 KW | Cutting Tool Material | Cr12MoV, heat treatment to HRC58-62 degree |
| 8. | Effective Size | As Customer Design | Roller | 45# steel |
| 9. | Control System | PLC Control System | Processing Mode | CNC lathes, Hear Treatment, hard Chrome Coated, with thickness 0.04mm |
| 10. | Testing Material | BMS Will Provide The Size of Feeding Material to Purchase That 2 Weeks Before Machine Testing | ||
Work Flow
Decoiler→Manual Pre-Cutter→Guide Feeding →Roll Forming System→Hydraulic Post Cutter →Exit Rack

Machine Components Display

Pre-cutter Roll Forming Mill

Hydraulic Post Cutter PLC Control System
Machine Produced Products



![]()
