A short, plain U channel needs frequent cuts. A longer channel with paired slots can keep the punch busy between cuts. Both jobs may run at the same forming speed when the strip is moving, yet produce very different quantities in a shift.
Run the short part to test the cutter and the slotted part to test the punch. Keep the standard line if it fills both orders within the shift. If it falls short, the trial will show which station needs to change.
Give each bidder two views of the part. The end view sets the web width, flange heights, inside bend radii and any steps in the base. The plan view locates the holes along the channel. Mark which finished end and which edge your inspector will measure from.
BMS lists its high-speed U channel roll forming machine as model YX25-45/55/65. The table specifies 0.4–0.6 mm galvanised coil and PLC control. Inline punching is optional. Because the headline and table give different speeds, get a written speed and cutoff specification for your material and part program.
A channel with lips turned inwards leaves less room for a tool to reach the web. If that is the section on your drawing, BMS’s strut channel machines are a more relevant starting point for the tooling discussion.
Start with the part you make most often. A dedicated punch earns its place when it removes a recurring operation or a delay. For an occasional slotted batch, it may be enough to form plain channel and punch it separately, provided the extra handling still fits the shift.
Two slots side by side can take one stroke with a paired die. With a single-slot tool, the bidder needs to show how the second slot is made. Counting the strokes per part tells you how much work the press must do.
A fixed press pauses the strip at each hit. A loop of strip can feed the rolls during the pause. If the punch cannot keep the loop supplied over a full batch, test a paired die or a flying punch. The flying tool must reset before the next hole arrives.
Try the shortest length you sell. At a given strip speed it gives the cutter the least time between pieces. This is where you can see whether paying for a moving cutter would help.
Consider two jobs made from the same coil and U section. The comparison below assumes one cut per piece, a die that removes no strip at the cut and no start-up scrap. The lengths and hole counts are illustrative.
Record the punch, feed and cutoff on one clock. Two stations can work at the same time, so adding their individual cycle times can count the same seconds twice. The time between finished pieces shows what the line delivered. The station timings explain why.
What to put side by side in two machine quotations
| Quantity | Evidence to request for each job |
|---|---|
| Nominal forming speed · m/min | Running strip speed on the specified coil and U section. Record which punch and cutter were operating. |
| Punch cycle · s | Time from a stroke until the punch is ready again. Mark any separate feed wait and the number of strokes the die needs per part. |
| Cutoff cycle · s | Time from the cut command until the tool is ready for another cut. Record the interval between successive cuts separately. |
| Finished length · mm | Programmed length and the measured lengths of consecutive pieces, including the first one after a change. Use the drawing tolerance. |
| Good parts per shift | Accepted count by part number, elapsed time, rejects and stoppages. Identify any coil or tool change left out of the trial. |
Suppose you need 300 good pieces of the 600 mm channel in one scheduled hour. You can put two numbers against that order.
These are demand figures. The rolls may need to feed faster to cover stops and rejects. Judge the trial by the accepted quantity of each part number. Extra plain channel cannot cover a shortfall in slotted parts.
Give both suppliers the same RFQ and agree on what counts as a finished part before the trial. If your customer requires a deburred end, for example, count the part after deburring and include the operator time.
To request a BMS quotation, send the drawing, material certificate and order list together. Ask BMS to price the punch, dies and cutoff separately and state which production target it will demonstrate on each job.
A change in pitch may only need a different feed program if the existing tool makes the same slot. A different slot width or shape needs matching tooling. Ask the supplier to mark which patterns share a die and price the exceptions.
It shows how many acceptable pieces of each part number came off the line in those 15 minutes. Record which stops occurred. Before using that run to plan a shift, allow for the coil changes, job changes and rejects your order mix brings, or ask for a longer mixed run.
Yes, if the feed and cutoff can locate the existing pattern. Have the supplier thread a fresh coil and show where it makes the first cut. The first accepted piece must meet the hole-to-end dimensions at both ends.
A shear die supports a particular cross-section. Ask which widths the quoted die supports, where inserts are needed and what has to change for a deeper flange. Compare cut ends from each size you order.
Start with the last acceptable piece of the old order and stop at the first acceptable piece of the new one. Include tool changes, program selection, trial pieces and inspection. That interval is the production time your schedule has to allow.
Record the grade, coating and measured thickness of the substitute. Use the run to inspect the setup and controls. Keep acceptance of job speed, hole position and cut quality open until you test the agreed coil or both parties accept revised terms in writing.