NEWS CENTER - BMS ROLL FORMING
You are here: Home » News » Industry News » U Channel Roll Forming Machine: Choosing Punching, Speed and Cutoff Options

U Channel Roll Forming Machine: Choosing Punching, Speed and Cutoff Options

Views: 0     Author: Site Editor     Publish Time: 2026-11-23      Origin: Site

Inquire

U Channel Roll Forming Machine: Choosing Punching, Speed and Cutoff Options

A short, plain U channel needs frequent cuts. A longer channel with paired slots can keep the punch busy between cuts. Both jobs may run at the same forming speed when the strip is moving, yet produce very different quantities in a shift.

Adjustable entry guides and the first forming rolls on the BMS U-channel line.
BMS strip entry and forming rolls. The speed through these rolls is only one part of the production cycle.

Run the short part to test the cutter and the slotted part to test the punch. Keep the standard line if it fills both orders within the shift. If it falls short, the trial will show which station needs to change.

Define the U profile and production task

Give each bidder two views of the part. The end view sets the web width, flange heights, inside bend radii and any steps in the base. The plan view locates the holes along the channel. Mark which finished end and which edge your inspector will measure from.

Top view into an open U channel showing hole pitch between centres and end offset from cut end A.
Two holes sit across the web at each position. Measure pitch along the channel and the first hole from cut end A.

BMS lists its high-speed U channel roll forming machine as model YX25-45/55/65. The table specifies 0.4–0.6 mm galvanised coil and PLC control. Inline punching is optional. Because the headline and table give different speeds, get a written speed and cutoff specification for your material and part program.

A channel with lips turned inwards leaves less room for a tool to reach the web. If that is the section on your drawing, BMS’s strut channel machines are a more relevant starting point for the tooling discussion.

Compare punching requirements

Start with the part you make most often. A dedicated punch earns its place when it removes a recurring operation or a delay. For an occasional slotted batch, it may be enough to form plain channel and punch it separately, provided the extra handling still fits the shift.

Where should the punch sit?

  • Before forming. A die can reach the flat strip from either side. This suits a repeating row of web slots. For a slot near a bend, inspect its shape after the flanges have been formed.
  • After forming. If the drawing locates a hole from a finished flange, the tool can use that flange as its reference. Check that the punch and its support fit inside the U. A hole measured from a cut end also needs a way to locate that end.

How many strokes does one channel need?

Two slots side by side can take one stroke with a paired die. With a single-slot tool, the bidder needs to show how the second slot is made. Counting the strokes per part tells you how much work the press must do.

Does the strip stop at every hit?

A fixed press pauses the strip at each hit. A loop of strip can feed the rolls during the pause. If the punch cannot keep the loop supplied over a full batch, test a paired die or a flying punch. The flying tool must reset before the next hole arrives.

Compare cutoff and length-control options

Try the shortest length you sell. At a given strip speed it gives the cutter the least time between pieces. This is where you can see whether paying for a moving cutter would help.

Two sequences showing strip feed pausing at a stationary cutter and a flying cutter travelling with the strip before returning.
During a flying cut, the tool moves with the channel. The carriage must clear the part and return before the next cut is due.
  • Stop-to-cut. The feed slows and stops while a fixed tool cuts. Keep this option if it produces the required number of acceptable short parts, including the time to stop and restart.
  • Flying cutoff. The channel keeps moving through the cut. A trial is worthwhile if repeated stops consume too much of the shift. Time a run of consecutive short pieces so the carriage has to make every return stroke.

What should the sample end look like?

  • End shape. A shear die should support both flanges. Measure the width at the cut and farther back to check for flare. If a saw is offered, allow for the material it removes and the time needed to clear chips or burrs.
  • Length and hole position. A drive-roll encoder measures roll movement and can miss strip slip. Check the cut length directly, then measure the first and last hole centres from the specified ends. Correct length and pitch can still leave the whole pattern out of position.

Check output with the actual hole and length program

Consider two jobs made from the same coil and U section. The comparison below assumes one cut per piece, a die that removes no strip at the cut and no start-up scrap. The lengths and hole counts are illustrative.

  • 600 mm plain channel Four pieces use 2.4 m of strip and require four cuts. If the strip repeatedly waits for the blade to clear, a quicker cutoff is worth testing on this job.
  • 2,400 mm slotted channel One piece uses the same 2.4 m and requires one cut. With two slots at each of twelve positions, a paired die needs twelve strokes. If the rolls wait for punched strip, improving the cutoff will leave that delay in place.

Record the punch, feed and cutoff on one clock. Two stations can work at the same time, so adding their individual cycle times can count the same seconds twice. The time between finished pieces shows what the line delivered. The station timings explain why.

What to put side by side in two machine quotations

Quantity Evidence to request for each job
Nominal forming speed · m/min Running strip speed on the specified coil and U section. Record which punch and cutter were operating.
Punch cycle · s Time from a stroke until the punch is ready again. Mark any separate feed wait and the number of strokes the die needs per part.
Cutoff cycle · s Time from the cut command until the tool is ready for another cut. Record the interval between successive cuts separately.
Finished length · mm Programmed length and the measured lengths of consecutive pieces, including the first one after a change. Use the drawing tolerance.
Good parts per shift Accepted count by part number, elapsed time, rejects and stoppages. Identify any coil or tool change left out of the trial.

Turn a shift order into a timing target

Suppose you need 300 good pieces of the 600 mm channel in one scheduled hour. You can put two numbers against that order.

  • 12 seconds per good piece 3,600 seconds ÷ 300 pieces gives the average time allowed per accepted piece.
  • 3 m/min of accepted channel 300 pieces × 0.6 m gives 180 m of good channel over 60 minutes.

These are demand figures. The rolls may need to feed faster to cover stops and rejects. Judge the trial by the accepted quantity of each part number. Extra plain channel cannot cover a shortfall in slotted parts.

Create the acceptance and RFQ checklist

Give both suppliers the same RFQ and agree on what counts as a finished part before the trial. If your customer requires a deburred end, for example, count the part after deburring and include the operator time.

  • Part and coil Send the U drawing, tolerances, hole pattern and finished lengths. Attach the certificate for the coil you buy. Specify grade, coating, thickness range, slit width, coil mass and inside and outside diameters.
  • Order mix List each part number, batch size and sequence, shift duration, available crew and required good parts per shift. Agree how long parts will be supported and stacked.
  • Factory supply Give the actual voltage, frequency, phases and available electrical load at the receiving plant in India. Ask for the connected load of the line with the quoted press, cutter and auxiliaries.
  • Acceptance Run both jobs on the agreed material, with a restart and a changeover. Record elapsed time, inspect samples against the drawing, and count accepted and rejected pieces by part number. Agree how a failed run will be repeated.

To request a BMS quotation, send the drawing, material certificate and order list together. Ask BMS to price the punch, dies and cutoff separately and state which production target it will demonstrate on each job.

Frequently Asked Questions

Will a new slot pattern require another die?

A change in pitch may only need a different feed program if the existing tool makes the same slot. A different slot width or shape needs matching tooling. Ask the supplier to mark which patterns share a die and price the exceptions.

Can a 15-minute trial establish a full shift’s output?

It shows how many acceptable pieces of each part number came off the line in those 15 minutes. Record which stops occurred. Before using that run to plan a shift, allow for the coil changes, job changes and rejects your order mix brings, or ask for a longer mixed run.

Can I use coil that already has the holes punched?

Yes, if the feed and cutoff can locate the existing pattern. Have the supplier thread a fresh coil and show where it makes the first cut. The first accepted piece must meet the hole-to-end dimensions at both ends.

Will one cutoff die cover several U widths?

A shear die supports a particular cross-section. Ask which widths the quoted die supports, where inserts are needed and what has to change for a deeper flange. Compare cut ends from each size you order.

How should I time a change between two orders?

Start with the last acceptable piece of the old order and stop at the first acceptable piece of the new one. Include tool changes, program selection, trial pieces and inspection. That interval is the production time your schedule has to allow.

What if the supplier only has a different coil for the trial?

Record the grade, coating and measured thickness of the substitute. Use the run to inspect the setup and controls. Keep acceptance of job speed, hole position and cut quality open until you test the agreed coil or both parties accept revised terms in writing.

Content list
ABOUT BMS
Founded in 1992, BMS Machinery joined XIAMEN BMS GROUP in 2017. Our manufacturing network in China includes 8 factories, 6 machining centers and 1 steel structure company, covering over 30,000 m². Supporting credentials include ISO9001:2015 quality management certification and SGS-issued CE/UKCA machinery compliance verifications. XIAMEN BMS GROUP’s Dun & Bradstreet D‑U‑N‑S Number is 55-379-8879.​​​​​​​
CONTACT BMS

  Office Address: 1002,Hualun International Mansion No.1, Guyan Road, Xiamen, Fujian,China.ZIP CODE: 36110 4
Factory Address: Longchi Development Area,Zhangzhou Taiwanese Investment Zone,Fujian Province,China (Zip Code:363107)
  +86-13328323529

  info@rollformingmill.com

   rollformingmill

Turkiye Distributor: 
DCB Metal Machinery
Address:İzmir Yolu Ertuğrul Mah. 146. Sok. Ruhi Plaza No:2/8 16120 Nilüfer/Bursa TÜRKİYE
GSM : +90 542 533 2080(Mr Ibrahim HARMAN- CEO)/+90 532 330 07 99(Mr Mr Hakan BAYRAKTAR-CTO​)​​
Web: www.dcbmachine.com
Copyright © 2026 BMS Machinery