| Availability: | |
|---|---|
| Quantity: | |
YX41-41
BMS
| No. | Main Parameters | Roll Forming Mill Parameters | ||
| 1. | Material Thickness | 1.5-3.0mm | Forming Stations | 28-steps |
| 2. | Feeding Width | 130-200 | Body Frame | H450 |
| 3. | Application Material | SuperDyma/Galvanized sheet/Black strip | Side Wall Thickness | 18mm |
| 4. | Electrical Standard | 380V50Hz/3Ph | Shaft Diameter | 45# Steel, φ85mm |
| 5. | Manual Decoiler Diameter | 3T-500MM | Main Motor Power | 15KW |
| 6. | Yield Strength | 345-550Mpa | Screw Bolts | Grade 8.8 |
| 7. | Forming Speed | 0-35m/min | Effective Width | According to the drawing |
| 8. | Control System | PLC Control System | Roller | Cr12 Steel,precision machined |
| 9. | Hydraulic Motor | 5.5KW | Machine Color | Blue+Black+Orange |
| 10. | Testing Material | BMS Will Provide The Size of Feeding Material to Purchase that 2 Weeks Before Machine Testing | ||
Work Flow
Manual Decoiler (5Tons) → Leveling Device/Punching Device→ Main Roll Forming Mill → Automatic non-stop sawing device → PLC Control System → Hydraulic Station→Exit Rack*2
Machine Components Display
Main Roll Forming Mill
Leveling Device
Punching Device
Post Cutter
Machine Produced Products



![]()

| No. | Main Parameters | Roll Forming Mill Parameters | ||
| 1. | Material Thickness | 1.5-3.0mm | Forming Stations | 28-steps |
| 2. | Feeding Width | 130-200 | Body Frame | H450 |
| 3. | Application Material | SuperDyma/Galvanized sheet/Black strip | Side Wall Thickness | 18mm |
| 4. | Electrical Standard | 380V50Hz/3Ph | Shaft Diameter | 45# Steel, φ85mm |
| 5. | Manual Decoiler Diameter | 3T-500MM | Main Motor Power | 15KW |
| 6. | Yield Strength | 345-550Mpa | Screw Bolts | Grade 8.8 |
| 7. | Forming Speed | 0-35m/min | Effective Width | According to the drawing |
| 8. | Control System | PLC Control System | Roller | Cr12 Steel,precision machined |
| 9. | Hydraulic Motor | 5.5KW | Machine Color | Blue+Black+Orange |
| 10. | Testing Material | BMS Will Provide The Size of Feeding Material to Purchase that 2 Weeks Before Machine Testing | ||
Work Flow
Manual Decoiler (5Tons) → Leveling Device/Punching Device→ Main Roll Forming Mill → Automatic non-stop sawing device → PLC Control System → Hydraulic Station→Exit Rack*2
Machine Components Display
Main Roll Forming Mill
Leveling Device
Punching Device
Post Cutter
Machine Produced Products



![]()


Strut Channel Roll Forming Machine Finished Product
Application case
Application case

Strut Channel Roll Forming Machine Finished Product
Application case
Application case